Now, The chassis is an S13 so its not a skyline however it is being powered by a 580 WHP RB27, so i figured this would be of interest to someone here.
For the most updated, consolidated build thread, refer here: http://bc240.com/index.php?showtopic=516
Last year's car:


Feb 17th:
Here are some pictures of what i'm doing at the moment:


Yeh... no pics of the actual car yet. Check back in a day or two.
Feb 21st:

Frame jig is just about done.

Attaching car to jig.

Front is attached

Welder crapped out as i was working on the back... <_<

Big turbo... Probably for sale.
Feb 23rd:

Rear is attached

Feb 26th:

Doors and hatch removed. Subframes removed. gas tank removed. started stripping down interior.
Mar 2nd:


Finished stripping down the interior today. Getting close to having the underside stripped down. Then its on to the interior sound deadening.
Mar 4th:

This is Trevor (Aka T-Bag)... i make him do free labor.

Chassis is just about stripped.
Mar 6th:

Further Chassis Striping

Started Stitch welding
Mar 7th:


More sanding, wire-wheeling, and welding. My least favorite part.
I'm coating all the seams with zinc weld-thru coating before welding, to prevent rust from occuring behind the welds and inside seams, then wire-wheeling it all off post-welding.
Mar 17th
Been slow on the updates here... progress has been slow. Wheel wells are a bitch, and i had some other distractions i had to work on.


No one supplied dry ice in town here, so i used this 60lb tank of liquid CO2 with a DEI CryO2 intercooler sprayer hooked to it to get better coverage.

Spare tire area cut out ready for fuel cell.
For the most updated, consolidated build thread, refer here: http://bc240.com/index.php?showtopic=516
Last year's car:


Feb 17th:
Here are some pictures of what i'm doing at the moment:


Yeh... no pics of the actual car yet. Check back in a day or two.
Feb 21st:

Frame jig is just about done.

Attaching car to jig.

Front is attached

Welder crapped out as i was working on the back... <_<

Big turbo... Probably for sale.
Feb 23rd:

Rear is attached

Feb 26th:

Doors and hatch removed. Subframes removed. gas tank removed. started stripping down interior.
Mar 2nd:


Finished stripping down the interior today. Getting close to having the underside stripped down. Then its on to the interior sound deadening.
Mar 4th:

This is Trevor (Aka T-Bag)... i make him do free labor.

Chassis is just about stripped.
Mar 6th:

Further Chassis Striping

Started Stitch welding
Mar 7th:


More sanding, wire-wheeling, and welding. My least favorite part.
I'm coating all the seams with zinc weld-thru coating before welding, to prevent rust from occuring behind the welds and inside seams, then wire-wheeling it all off post-welding.
Mar 17th
Been slow on the updates here... progress has been slow. Wheel wells are a bitch, and i had some other distractions i had to work on.


No one supplied dry ice in town here, so i used this 60lb tank of liquid CO2 with a DEI CryO2 intercooler sprayer hooked to it to get better coverage.

Spare tire area cut out ready for fuel cell.















Comment