looks like there would be no room for the turbos other wise.
Announcement
Collapse
No announcement yet.
C-unit's NuB GTR project o0o!!
Collapse
X
-
-
finally back on track. buddy finished 1 side of the intercooler and all pipings. Still need to some final touch up and new couplers.
Also bought a new camera so no more iphone photos.
It'll be running on Map sensor with proEFI pro48 standalone.
With the Intake install. (Not using that HKS filter, I am going with the AEM dry filter)
Rad will be mounted in an angle to clear everything.Biggest selection of Skyline CarbonFiber & FRP Aero in Canada. PM me.
Comment
-
Long time no update but that doesn't mean I stop working on the car!
i've been ordering/collecting parts for the past 2 months. Any how, here it is!
Final check on the downpipe and manifold before taking it to ceramic coating.
Everything is ready for ceramic coating.
Wheels has been refinished but I might want to sell them for something abit bigger. If you are interested, please pm me.
Nismo LMGT magnesium
18x10 +20
Toyo R888 265/35R18
comes with full center cap and stickers.
Bought abunch of AN fittings for turbo and coolant lines.
And one day I was preping the enigne bay, I discovered some rust near my strut tower. i was mad and I cut it out. Then I took it to my buddy for some reinforcement. You can see the hole i cut out.
Some plate and rollcage tubing. 2hrs later:
Primered
KH2 base coat
Clear coat..i know it looks shitty. First time painting so give me a break. I will wet sand and polish it out.
Temp BBK for now before my Project Mu comes in.
brembo 6pot 355mm 2pcs rotor.
I also use the gator bedliner for my wheel well. Very nice stuff. easy to apply with brush. Super durable finish. Way better than the rubber under coat i used before.
All brackets painted as well.
Nice and fresh for the VQ
Rear are done as well..bedlinered wheel well
Brembo 4pot BBK 345mm 2pcs rotors
Fail body work atempt
Car is towed to body shop today for rear fender work.
and appearently with the pull fender..the 18x10 +20 becomes fail fitment.
Side shot
Body work will be done and car will be wired up next week!! VEEEEEEEEEEEEEEBiggest selection of Skyline CarbonFiber & FRP Aero in Canada. PM me.
Comment
-
Ouch sorry about that stance
Sent from my HTC Magic using Tapatalk
Comment
-
**** load of fittings, hoses and labour, this is the result
AN-4 oil feed
AN-8 oil drain
AN-6 coolant feeds and drain
Still need to make an adaptor.
AN-8 bung welded to oil pan
Engine rear water neck.
AN-8 reroute
AN-10 heater hose
plugged throttle body water lines
Biggest selection of Skyline CarbonFiber & FRP Aero in Canada. PM me.
Comment
Comment