Im betting it wont come with the brackets. You'll have to fab some up. I can make another set like mine and send them over if you want.
Announcement
Collapse
No announcement yet.
The Quonset Project
Collapse
X
-
Progress.
Bored, honed and decked.
Crank in.
86.5mm slugs in.
Rear main.
Pumps.
Things.
Studs.
Head.
Cams.
I dont have the intake cam -> sprocket bolt so Im stuck here for now.
Oil pan is not on because im waiting on an angle wrench to finish up the rods. Getting closer.. and im ******* fired up for it.
Comment
-
Wow man, great photo documentation, you really helped me better understand the assembly of an RB engine. Thanks!1999 Nissan Stagea RS Four S, White
Previous JDM Rides:
1992 Nissan President Sovereign Junction Produce, Black (sold to NICOclubber)
1991 Nissan Skyline GT-R, Black (sold to GTRCer)
1989 Nissan Skyline GTS-4, Black (sold to GTRCer)
Comment
-
Nice Anton nice! i took my 26 there 2 weeks ago and its almost done. Just needs to be decked an I can pick it up. I was expecting 1 month+. Def a good machine shop. a bore, hone , deck, and hot tank is 360 + taxes. Gimme a ride when its good to go! D+w is the place to go!
Comment
Comment